NOTE:
Although all of these digitized articles are 60 or more years old, and likely have minimal commercial value today, the reader should bear in mind that material dated after 1923 remains under copyright by Simmons-Boardman Publishing.
These articles and the information contained therein may be freely reproduced or used in printed or electronic form for non-commercial or educational purposes, provided the copyright holder and original author (if known) are acknowledged, and provided that such publication also refers readers to the original document on this site.
Simply making interesting material available to those who share my interest in the railway signal systems of the past has been my sole objective in this long project.
1929 | NYC Expands Electric Plant By Adding 48 Levers 2.7 MB |
---|
1929 | 1929 index 7.4 MB |
---|
1929 | C&EI Derailment and Collision at Chicago 755.9 KB |
---|
1929 | Spring Switches on Illinois Central 415.8 KB |
---|
1929 | C&EI Derailment and Collision at Chicago 755.9 KB |
---|
1929 | Adjustment of Clockwork Time Releases 1.4 MB |
---|---|
1929 | Detector Locking Should Not Have an Emergency Release 1.3 MB |
1929 | Secure New Ordinances for Changes in Crossing Protection 691.4 KB |
1929 | Mechanical Selector for Interlocker 361.4 KB |
---|---|
1929 | Rear-End Flagging 745.4 KB |
1929 | Maintenance Tests at Burlington Interlocker 1.2 MB |
---|
1929 | Spring Switches on Illinois Central 415.8 KB |
---|
1929 | Frisco Installs Semaphores with Color-Light Indication 665.1 KB |
---|
1929 | Adjustment of Clockwork Time Releases 1.4 MB |
---|---|
1929 | What Kind of Control for Take-Siding Signals? 512.5 KB |
1929 | Where Should Grade Signals Be Installed? 1.2 MB |
1929 | Automatic Interlocker Saves Over 8,000 Train Stops Annually 1.7 MB |
---|---|
1929 | C. & A. Modernizes Signaling Facilities 2.2 MB |
1929 | The Chicago & Alton Installs Mechanical Plant 1.3 MB |
1929 | C&EI Derailment and Collision at Chicago 755.9 KB |
---|
1929 | Adjustment of Clockwork Time Releases 1.4 MB |
---|---|
1929 | C&NW Employs Centralized Control To Speed Up Trains 3.0 MB |
1929 | Further Comments on Detector Locking Releases 511.5 KB |
1929 | Report on C&NW Side Collision at Chicago 569.4 KB |
1929 | Secure New Ordinances for Changes in Crossing Protection 691.4 KB |
1929 | Automatic Gauntlet Signals Installed on the South Shore 1.9 MB |
---|---|
1929 | Marker Lights on Automatic Signals 994.2 KB |
1929 | Trap Circuit for Drawbridge 980.8 KB |
1929 | Centralized Control Used for Ends of Double Track 2.1 MB |
---|---|
1929 | Interlocking Controlled Remotely 2.7 MB |
1929 | Maintenance Tests at Burlington Interlocker 1.2 MB |
1929 | Signaling Problems of the Future 1.5 MB |
1929 | C&EI Derailment and Collision at Chicago 755.9 KB |
---|---|
1929 | NYC Expands Electric Plant By Adding 48 Levers 2.7 MB |
1929 | Report on C&NW Side Collision at Chicago 569.4 KB |
1929 | NYC Expands Electric Plant By Adding 48 Levers 2.7 MB |
---|---|
1929 | Rock Island Uses Novel System for Operation by Signal Indication 1.7 MB |
1929 | Secure New Ordinances for Changes in Crossing Protection 691.4 KB |
1929 | Signal Aspects at End of Double Track 514.3 KB |
1929 | Elimination of Lock Rods 947.9 KB |
---|
1929 | Big Four Improves Operation by Remote Control 2.5 MB |
---|---|
1929 | Electric Approach and Stick Locking Features 866.2 KB |
1929 | Manual Block Signals Controlled Remotely on the Big Four 1.1 MB |
1929 | Pennsylvania Installs APB Signaling on 86 Miles 3.7 MB |
---|
1929 | D&RGW Expedites Trains With Centralized Control 2.1 MB |
---|
1929 | The Chicago & Alton Installs Mechanical Plant 1.3 MB |
---|
1929 | D&RGW Expedites Trains With Centralized Control 2.1 MB |
---|---|
1929 | Signal Aspects at End of Double Track 514.3 KB |
1929 | Where Should Grade Signals Be Installed? 1.2 MB |
1929 | Trap Circuit for Drawbridge 980.8 KB |
---|
1929 | NYC Expands Electric Plant By Adding 48 Levers 2.7 MB |
---|
1929 | Pennsylvania Installs APB Signaling on 86 Miles 3.7 MB |
---|
1929 | An Electric Lock for Mechanical Levers 999.0 KB |
---|
1929 | Trap Circuit for Drawbridge 980.8 KB |
---|
1929 | Educate Highway Users to Observe Crossing Signals 615.5 KB |
---|---|
1929 | The Year 1928 in Retrospect and the Outlook for 1929 1.5 MB |
1929 | Frisco Installs Semaphores with Color-Light Indication 665.1 KB |
---|
1929 | Report on IC Derailment at Interlocking Plant 647.6 KB |
---|
1929 | 1929 index 7.4 MB |
---|
1929 | Institution of Signal Engineers Meets in Holland 1.5 MB |
---|
1929 | Interlocking Controlled Remotely 2.7 MB |
---|
1929 | Rear-End Flagging 745.4 KB |
---|
1929 | Big Four Improves Operation by Remote Control 2.5 MB |
---|
1929 | C. & A. Modernizes Signaling Facilities 2.2 MB |
---|
1929 | Simplified Electric Interlocking Plant on Michigan Central.pdf 3.6 MB |
---|---|
1929 | What Kind of Control for Take-Siding Signals? 512.5 KB |
1929 | D&RGW Expedites Trains With Centralized Control 2.1 MB |
---|
1929 | Batting Averages for Signal Maintainers on MP 477.0 KB |
---|
1929 | NYC Expands Electric Plant By Adding 48 Levers 2.7 MB |
---|
1929 | Secure New Ordinances for Changes in Crossing Protection 691.4 KB |
---|---|
1929 | Where Should Grade Signals Be Installed? 1.2 MB |
1929 | Institution of Signal Engineers Meets in Holland 1.5 MB |
---|
1929 | Pennsylvania Installs APB Signaling on 86 Miles 3.7 MB |
---|
1929 | Are Automatic Signals on Sidings Justified? 1.6 MB |
---|---|
1929 | Automatic Interlocker Saves Over 8,000 Train Stops Annually 1.7 MB |
1929 | Detector Locking Should Not Have an Emergency Release 1.3 MB |
1929 | Marker Lights on Automatic Signals 994.2 KB |
1929 | NYC Expands Electric Plant By Adding 48 Levers 2.7 MB |
1929 | Signal Aspects at End of Double Track 514.3 KB |
1929 | Mechanical Locking Suggestion 369.2 KB |
---|---|
1929 | Where Should Grade Signals Be Installed? 1.2 MB |
1929 | Mathematics of the A.C. Track Circuit 974.9 KB |
---|---|
1929 | Rear-End Flagging 745.4 KB |
1929 | Where Should Grade Signals Be Installed? 1.2 MB |
1929 | Big Four Improves Operation by Remote Control 2.5 MB |
---|
1929 | Adjustment of Clockwork Time Releases 1.4 MB |
---|---|
1929 | Are Automatic Signals on Sidings Justified? 1.6 MB |
1929 | C&EI Derailment and Collision at Chicago 755.9 KB |
1929 | Control Schemes for Take-Siding Indicators 360.3 KB |
1929 | Pennsylvania Installs APB Signaling on 86 Miles 3.7 MB |
1929 | Pennsylvania Installs Interlocking at Lancaster, PA 3.6 MB |
1929 | What Kind of Control for Take-Siding Signals? 512.5 KB |
1929 | Where Should Grade Signals Be Installed? 1.2 MB |
1929 | Are Automatic Signals on Sidings Justified? 1.6 MB |
---|
1929 | Frisco Installs Semaphores with Color-Light Indication 665.1 KB |
---|
1929 | Marker Lights on Automatic Signals 994.2 KB |
---|---|
1929 | Rear-End Flagging 745.4 KB |
1929 | C. & A. Modernizes Signaling Facilities 2.2 MB |
---|
1929 | Frisco Installs Semaphores with Color-Light Indication 665.1 KB |
---|---|
1929 | What Type of Release at Automatic Interlockers? 1.0 MB |
1929 | D&RGW Expedites Trains With Centralized Control 2.1 MB |
---|
1929 | Big Four Improves Operation by Remote Control 2.5 MB |
---|
1929 | Frisco Installs Semaphores with Color-Light Indication 665.1 KB |
---|
1929 | Scientific Research on Track Circuits 844.6 KB |
---|
1929 | Simplification of Apparatus Will Expand Usefulness of Signaling 1.3 MB |
---|---|
1929 | The Year 1928 in Retrospect and the Outlook for 1929 1.5 MB |
1929 | What Is the Future of Train Control? 1.8 MB |
1929 | Frisco Installs Semaphores with Color-Light Indication 665.1 KB |
---|
1929 | "Union" Clock-Work Time Release 611.8 KB |
---|---|
1929 | "Union" Thermal Relay 1.0 MB |
1929 | A Time-Element Relay 572.7 KB |
1929 | US&S float 512.3 KB |
1929 | What Is the Future of Train Control? 1.8 MB |
1929 | Pennsylvania Installs APB Signaling on 86 Miles 3.7 MB |
---|
1929 | Pennsylvania Installs APB Signaling on 86 Miles 3.7 MB |
---|